{"id":861,"date":"2026-10-08T00:00:00","date_gmt":"2026-10-08T00:00:00","guid":{"rendered":"https:\/\/vulpin.capital\/blog\/measuring-construction-project-success-beyond-cost-and-schedule\/"},"modified":"2026-10-08T04:21:21","modified_gmt":"2026-10-08T04:21:21","slug":"measuring-construction-project-success-beyond-cost-and-schedule","status":"publish","type":"post","link":"https:\/\/vulpin.capital\/blog\/measuring-construction-project-success-beyond-cost-and-schedule\/","title":{"rendered":"Measuring Construction Project Success: Beyond Cost and Schedule"},"content":{"rendered":"<p>What if a construction project meets its budget and handover date, yet still fails to deliver an asset that performs as intended? Measuring construction project success requires more than a final cost report and a schedule comparison. Those measures matter, but they can\u2019t show the whole result.<\/p>\n<p>Cost and schedule reports give teams a necessary view of progress. They don\u2019t reveal every quality defect, safety concern, scope issue, or operational weakness. And when each team defines success differently, inconsistent reporting can hide variance until decisions are harder to make. Success needs a shared standard, supported by evidence gathered throughout execution.<\/p>\n<p>This article explains how to build a compact set of measures tied to project objectives. You\u2019ll see how delivery, financial control, quality, safety, and long-term asset performance fit together, and how clear thresholds can help teams respond to emerging problems. The aim isn\u2019t to make every metric equal. It\u2019s to assess what was delivered, how reliably it was delivered, and whether the asset can meet its intended purpose over time.<\/p>\n<div class=\"key-takeaways\">\n<h2 id=\"key-takeaways\">Key Takeaways<\/h2>\n<ul>\n<li>Define success around the outcomes the asset must deliver, and account for how owners, project teams, and future operators may assess results differently.<\/li>\n<li>Choose measures across delivery, financial control, scope and quality, safety, and operational readiness. No single indicator proves the project succeeded.<\/li>\n<li>Use measuring construction project success to look beyond favourable cost and schedule variance and test whether the work meets its intended requirements.<\/li>\n<li>For every measure, assign an owner, identify its data source, set a reporting interval, and establish a threshold that prompts review.<\/li>\n<li>Set evidence standards and decision rights before committing resources, then connect project reporting to ongoing viability and asset performance.<\/li>\n<\/ul>\n<\/div>\n<div class=\"table-of-contents\" role=\"navigation\" aria-label=\"Table of Contents\">\n<h2 id=\"table-of-contents\">Table of Contents<\/h2>\n<ul>\n<li><a href=\"#what-does-measuring-construction-project-success-actually-mean\">What Does Measuring Construction Project Success Actually Mean?<\/a><\/li>\n<li><a href=\"#which-construction-project-success-metrics-should-you-track\">Which Construction Project Success Metrics Should You Track?<\/a><\/li>\n<li><a href=\"#why-cost-and-schedule-alone-can-misstate-construction-project-success\">Why Cost and Schedule Alone Can Misstate Construction Project Success<\/a><\/li>\n<li><a href=\"#how-to-build-a-construction-project-success-measurement-process\">How to Build a Construction Project Success Measurement Process<\/a><\/li>\n<li><a href=\"#how-governance-makes-construction-project-success-verifiable\">How Governance Makes Construction Project Success Verifiable<\/a><\/li>\n<\/ul>\n<\/div>\n<h2 id=\"what-does-measuring-construction-project-success-actually-mean\">What Does Measuring Construction Project Success Actually Mean?<\/h2>\n<p>Measuring construction project success means verifying that a project delivered its intended outcomes, supported by evidence, not merely that the work was completed. The evidence should show whether the agreed scope was delivered, whether it meets defined quality expectations, and whether the resulting asset is ready to serve its purpose.<\/p>\n<p>Construction projects produce outputs: a completed building, installed systems, and handed-over documentation. Those outputs matter. But they are not the same as outcomes. An asset\u2019s outcome is its ability to be used and maintained as intended over time. A handover can mark the end of construction without proving the asset will perform reliably for the people who depend on it.<\/p>\n<p>Schedule and budget remain essential controls. They show whether delivery is tracking against time and financial commitments. They can also help decision-makers respond to variance before it compounds. But a project can meet both targets and still have unresolved quality deficiencies, incomplete operational information, or a mismatch between the delivered scope and the original purpose. <a href=\"https:\/\/en.wikipedia.org\/wiki\/Project_management\">Project management success<\/a> is often discussed through cost, schedule, and scope; a construction-specific assessment must also connect those controls to the asset\u2019s intended use.<\/p>\n<p>That connection begins with objectives established before work proceeds. Define what the asset must enable, what evidence will demonstrate acceptance, and what conditions would require corrective action. This creates a stable basis for review. It also helps prevent success from being redefined after results are known. A governance process such as The VULPIN Check reflects this emphasis on verifying viability before resources are committed.<\/p>\n<h3>Project completion versus project success<\/h3>\n<p>Finishing contracted work confirms a delivery milestone. It doesn\u2019t, by itself, confirm that the project achieved the purpose for which it was funded. Scope acceptance, quality evidence, and operational readiness add necessary context. <strong>A delivered project is work completed and handed over; a successful asset outcome is that delivery meeting its intended purpose and providing evidence that it can be used as planned.<\/strong><\/p>\n<h3>Whose definition of success should guide measurement?<\/h3>\n<p>The owner may prioritize the project\u2019s purpose and stewardship of resources. The delivery team may focus on executing agreed scope. Users need an asset that functions for its intended tasks, while future operators need the information and readiness to manage it. These perspectives can differ without being incompatible.<\/p>\n<p>Agree on objectives and evidence with these stakeholders before work begins. For example, a facility project might define completion as accepted construction, while users also need spaces that support their intended activities and operators need usable handover information. Recording these expectations early gives the team a common standard for evaluating results, rather than allowing each group to apply a different definition after the project is delivered.<\/p>\n<h2 id=\"which-construction-project-success-metrics-should-you-track\">Which Construction Project Success Metrics Should You Track?<\/h2>\n<p>A useful scorecard is compact, tied to the project\u2019s objectives, and built from evidence teams can check. Measuring construction project success doesn\u2019t require collecting every available KPI. It requires selecting indicators that expose meaningful variance and support a decision. Construction measures can span safety, quality, productivity, and client satisfaction, as outlined in <a href=\"https:\/\/www.vitruvisoftware.com\/blog\/construction-kpis\">Key Performance Indicators (KPIs) for construction<\/a>. The right mix depends on the asset and what it must do.<\/p>\n<p>Use five measure groups as a starting point. For each, record the indicator, its definition, data source, accountable owner, review interval, and threshold for action. A measure shows one part of performance. It doesn\u2019t prove overall success by itself.<\/p>\n<ul>\n<li><strong>Delivery:<\/strong> Track milestone variance and forecast completion against the approved baseline. These indicate whether key work is progressing as planned, but not whether the finished work meets quality or operational needs.<\/li>\n<li><strong>Financial control:<\/strong> Compare the approved budget with actual expenditure and the current cost forecast. The forecast estimates the expected final position; actual expenditure records what has already been incurred.<\/li>\n<li><strong>Scope and quality:<\/strong> Monitor accepted scope, inspection outcomes, and open deficiencies, including their status and severity. Inspection results offer evidence of conformance, but don\u2019t alone establish that the asset will perform as intended over time.<\/li>\n<li><strong>Safety:<\/strong> Record safety events using consistent project definitions and review relevant preventive actions. Event counts describe reported outcomes, not every underlying hazard or the strength of safety practices.<\/li>\n<li><strong>Operational readiness:<\/strong> Track commissioning status, unresolved handover items, and the completeness of required operating information. These measures indicate readiness for intended use, but don\u2019t establish long-term performance after occupancy or operation.<\/li>\n<\/ul>\n<h3>Delivery and financial control indicators<\/h3>\n<p>Use milestone variance to identify slippage, then update the forecast completion date when progress or constraints change. Review cost against both the approved budget and the latest forecast. If Earned Value Management is used, planned value represents budgeted work scheduled, while earned value represents the budgeted value of work completed. Comparing these with actual cost can clarify progress and cost performance, provided teams use consistent definitions and verified inputs.<\/p>\n<p><strong>Recorded expenditure tells you what has been spent; the forecast tells you what the project may still require.<\/strong> Neither should be interpreted alone. PCMNow Project Management emphasizes construction-cost reality and disciplined execution, linking reported performance to decisions rather than treating reports as an end in themselves.<\/p>\n<h3>Quality, safety, and asset-readiness indicators<\/h3>\n<p>Choose indicators that reflect the project\u2019s risks and intended use. Track inspection results alongside unresolved deficiencies, since a high pass rate can conceal a small number of serious open items. Pair safety-event reporting with reviews of preventive actions. For readiness, assess commissioning progress and whether handover information supports the owner\u2019s planned operation. Set thresholds for the specific project, not borrowed targets without context.<\/p>\n<p>Keep comparisons disciplined. Benchmarks are useful only when project scope, timing, metric definitions, and data sources are comparable. A small, consistently measured scorecard is more useful than a long list of figures that cannot guide action. Governance and verification principles, including those used in <a href=\"https:\/\/vulpin.capital\">The VULPIN Check<\/a>, can help establish measures before resources are committed.<\/p>\n<h2 id=\"why-cost-and-schedule-alone-can-misstate-construction-project-success\">Why Cost and Schedule Alone Can Misstate Construction Project Success<\/h2>\n<p>A project can appear financially controlled and on schedule while important conditions remain unresolved. A cost-and-schedule-only view reports whether delivery is tracking against two baselines. A balanced view asks what those results include: approved scope, quality evidence, safety performance, and readiness for intended use. Favourable variance is useful information, not proof that the asset meets its requirements.<\/p>\n<p>More reporting isn\u2019t automatically better. A scorecard crowded with measures can obscure the few signals that require a decision. Select indicators that connect to project objectives, assign an owner, and establish what action follows a threshold breach. Measuring construction project success becomes more useful when each number answers a practical question.<\/p>\n<h3>When a project appears on time and on budget<\/h3>\n<p>Dates and forecasts can remain unchanged even as scope items are incomplete or defects remain open. Interpret variance against a controlled baseline, with approved changes recorded separately. A change may reflect a deliberate decision, not poor performance. The key is to show its effect on scope, cost, timing, quality, and readiness, rather than quietly resetting the comparison point.<\/p>\n<p>Nor does every variance signal failure. A milestone may move because an approved change improves the project\u2019s fit for purpose. A cost forecast may rise because a risk has been identified and addressed. Review the cause, authorization, consequence, and remaining exposure before judging the result.<\/p>\n<table>\n<thead>\n<tr>\n<th>Metric<\/th>\n<th>Useful signal<\/th>\n<th>Blind spot<\/th>\n<th>Follow-up question<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Schedule variance<\/td>\n<td>Progress against milestone dates<\/td>\n<td>Whether completed work is acceptable<\/td>\n<td>What scope or quality evidence supports the reported progress?<\/td>\n<\/tr>\n<tr>\n<td>Cost forecast<\/td>\n<td>Expected financial position against the approved budget<\/td>\n<td>Whether the asset will be ready for intended use<\/td>\n<td>Which approved changes or unresolved risks affect the forecast?<\/td>\n<\/tr>\n<tr>\n<td>Open deficiencies<\/td>\n<td>Outstanding items requiring correction or disposition<\/td>\n<td>The full condition of work not yet inspected<\/td>\n<td>Which items affect acceptance, safety, or operation?<\/td>\n<\/tr>\n<tr>\n<td>Readiness status<\/td>\n<td>Progress toward commissioning and handover<\/td>\n<td>Long-term asset performance<\/td>\n<td>What evidence remains before the owner can use the asset as planned?<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>How project trade-offs affect the final result<\/h3>\n<p>Trade-offs can distribute benefits and burdens differently. For example, reducing a planned feature may protect a milestone but change what users can do in the completed space. A documented decision states what changed, who authorized it, and how the revised outcome will be assessed. An unapproved scope reduction or an unresolved defect is different: it can conceal deterioration behind a favourable report.<\/p>\n<p>Keep the record plain. Preserve the original baseline, identify approved revisions, and report current status against both where useful. This lets owners and delivery teams distinguish a governed adjustment from a result that no longer meets the original requirement. It also gives future operators a clearer account of what was delivered and why.<\/p>\n<p><strong>No single performance indicator proves overall success; evidence must show how delivery, scope, quality, safety, and readiness fit together.<\/strong> A concise set of decision-relevant measures adds control without turning reporting into an end in itself.<\/p>\n<p><!-- autoseo-infographic --><\/p>\n<div class=\"autoseo-infographic-container\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1055\" height=\"2560\" src=\"https:\/\/vulpin.capital\/blog\/wp-content\/uploads\/2026\/10\/infographic_1791433273_Ror4zPYb-scaled.jpg\" class=\"autoseo-infographic-image skip-lazy no-lazy\" alt=\"Measuring Construction Project Success: Beyond Cost and Schedule\" loading=\"eager\" data-no-lazy=\"1\" data-skip-lazy=\"1\" \/><\/div>\n<p><!-- \/autoseo-infographic --><\/p>\n<h2 id=\"how-to-build-a-construction-project-success-measurement-process\">How to Build a Construction Project Success Measurement Process<\/h2>\n<p>A measurement process is useful only if it produces comparable evidence and informs decisions. Build it before execution, then apply it consistently as the project changes. The sequence is straightforward: define intended outcomes, choose evidence, set baselines and thresholds, assign responsibility, review variance, and record decisions and follow-up.<\/p>\n<p>Keep the scorecard focused. For every measure, document:<\/p>\n<ul>\n<li><strong>Owner:<\/strong> who verifies the measure and explains variance.<\/li>\n<li><strong>Data source:<\/strong> the record or system used, such as an approved schedule, cost forecast, inspection record, or commissioning log.<\/li>\n<li><strong>Reporting interval:<\/strong> how often it is reviewed, based on the project\u2019s decision needs.<\/li>\n<li><strong>Threshold:<\/strong> the project-specific condition that triggers investigation, escalation, or a corrective decision.<\/li>\n<\/ul>\n<p>These definitions prevent teams from reporting the same measure in different ways. They also connect reporting to execution, rather than treating the scorecard as an administrative exercise.<\/p>\n<h3>Set objectives, baselines, and decision thresholds<\/h3>\n<p>Translate each owner objective into an observable result and specify what evidence will demonstrate it. If operational readiness matters, for example, define which commissioning records or handover items must be complete before the asset is considered ready for its planned use.<\/p>\n<p>Before execution, record the approved scope, schedule, and budget baselines, including key assumptions and who can authorize changes. Establish thresholds according to the project\u2019s objectives, risks, and decision structure. A threshold is not a universal industry target. It is a pre-agreed point at which the team must assess the cause and determine what happens next.<\/p>\n<p>A documented <a href=\"https:\/\/vulpin.capital\/blog\/the-construction-project-governance-framework-a-manual-for-asset-survivability\/\">construction project governance framework<\/a> can help connect objectives, evidence, accountability, and decision rights. This matters when a change affects more than one measure. A scope adjustment, for instance, may alter cost, timing, acceptance requirements, or readiness, so the impact should be recorded against the relevant baselines.<\/p>\n<h3>Review evidence and turn variance into decisions<\/h3>\n<p>At each reporting interval, compare verified actual results and current forecasts with the approved baselines. For every material variance, record its cause, accountable owner, decision, and follow-up date. If the team takes no corrective action, document why and when the issue will be reviewed again.<\/p>\n<p>Consider a commissioning item that remains incomplete as handover approaches. The process should identify its status, the evidence supporting that status, who owns resolution, and whether the issue affects planned use. That record lets decision-makers distinguish a manageable open item from a condition that requires escalation.<\/p>\n<p><strong>Reliable measurement creates value when verified evidence leads to timely, documented action.<\/strong> For construction-cost reporting, connect forecasts and variance decisions to a clear method for managing construction project cost overruns. PCMNow Project Management also centres on construction-cost reality and disciplined execution, keeping performance information tied to project decisions.<\/p>\n<p>Build a measurement process around evidence and accountable decisions. <a href=\"https:\/\/vulpin.capital\">Explore VULPIN\u2019s governance approach<\/a> to project viability and disciplined execution.<\/p>\n<h2 id=\"how-governance-makes-construction-project-success-verifiable\">How Governance Makes Construction Project Success Verifiable<\/h2>\n<p>Governance turns project objectives into rules for evidence, accountability, and decisions. It establishes who can approve a change, what proof supports a reported result, and what happens when conditions move outside agreed limits. These controls matter before resources are committed, not only after a variance appears. Without them, teams can report activity without establishing whether the project remains viable or fit for its intended purpose.<\/p>\n<p>For measuring construction project success, the test is not simply whether a measure is available. The evidence must connect execution to the owner\u2019s objectives and the asset\u2019s intended use. Governance gives that evidence an authorized meaning. It also helps distinguish a deliberate adjustment from a change that weakens the outcome without clear approval.<\/p>\n<h3>Use verification before and during execution<\/h3>\n<p>The VULPIN Check is a governance and verification process for real asset deployment. Its role is to assess project viability before resources are committed, using predefined proof rather than relying on optimism or a single forecast. Those criteria can establish what must be demonstrated, who reviews the evidence, and which conditions warrant a decision to proceed, revise, or stop. The VULPIN Check governance standard describes this verification-led approach.<\/p>\n<p>Verification should continue as project conditions change. A viable plan at the outset may face new information about scope, execution, or the asset\u2019s intended function. Agreed review points allow decision-makers to test whether assumptions still hold and whether the evidence supports continuing with the current plan. They don\u2019t guarantee a particular result. They make the basis for a decision visible and documented.<\/p>\n<h3>Keep measurement connected to construction execution<\/h3>\n<p>Project measures have little value if they remain isolated in reports. They need to inform decisions about the work: what requires attention, who is responsible, and whether a change affects the approved purpose. PCMNow Project Management focuses on construction-cost reality and disciplined execution. That connection keeps cost and progress information relevant to the decisions being made on the project, while preserving a record of the rationale and evidence.<\/p>\n<p>For example, if a revised forecast coincides with an unresolved handover requirement, the governance question is not only whether the forecast is acceptable. Decision-makers must also understand the effect on readiness, the owner\u2019s requirements, and the asset\u2019s continuing viability. Documented measures support that review; they do not replace judgement or assure long-term performance. The Fox provides a rule-governed framework for asset survivability and decision-making, extending the focus beyond the completion milestone.<\/p>\n<p>Governance makes results auditable and decisions accountable. If you\u2019re exploring governance-led project execution, visit <a href=\"https:\/\/vulpin.capital\/\">VULPIN Capital<\/a>.<\/p>\n<h2 id=\"make-the-next-project-decision-on-evidence\">Make the Next Project Decision on Evidence<\/h2>\n<p>The next step is to make measurement part of project governance before the next commitment of resources. Put the intended asset outcome, evidence requirements, and decision authority into a working project record. Then revisit that record when assumptions change. This gives teams a consistent basis for deciding whether to proceed, adjust, or pause, rather than relying on a favourable status update alone.<\/p>\n<p>That discipline is the point of measuring construction project success: not producing more reports, but making consequential decisions traceable to verified information. The VULPIN Check supports governance and verification for real asset deployment. PCMNow connects project management to construction-cost reality and disciplined execution, while The Fox provides a rule-governed framework for asset survivability and decision-making.<\/p>\n<p>If your next project needs a clearer link between governance, execution, and lasting asset value, <a href=\"https:\/\/vulpin.capital\"><strong>explore governance-led construction project execution with VULPIN Capital<\/strong><\/a>. A sound measurement framework gives your team a stronger basis for the decisions ahead.<\/p>\n<h2 id=\"frequently-asked-questions\">Frequently Asked Questions<\/h2>\n<h3>What is the most important measure of construction project success?<\/h3>\n<p>The most important measure is whether the completed asset achieves the owner\u2019s primary intended outcome. That outcome differs by project, so identify it before choosing a KPI. For a facility intended to support a specific operation, for example, a useful test is whether the required spaces and systems are available for that operation. Cost and schedule still matter, but they can\u2019t substitute for evidence that the asset fulfils its core purpose.<\/p>\n<h3>Can a construction project be successful if it finishes late or over budget?<\/h3>\n<p>Yes, a project can still achieve its intended purpose despite a schedule or budget variance, but the variance needs an accountable explanation. Consider a delay caused by an approved scope change that addresses a previously identified requirement. The owner should assess the revised outcome, the impact on use, and the authorization record. An unexplained variance or an undisclosed reduction in scope is different, and may indicate that reported success doesn\u2019t reflect what was delivered.<\/p>\n<h3>How often should construction project performance be measured?<\/h3>\n<p>Measure performance often enough to support decisions before issues become harder to address. The interval should reflect the measure and the project\u2019s pace: a critical-path constraint may need more frequent review than a handover item that changes only as commissioning progresses. Set the cadence in advance, then increase review frequency when a threshold is crossed or a material change occurs. Keep reporting dates consistent so trends can be compared meaningfully.<\/p>\n<h3>What is the difference between a KPI and a success criterion in construction?<\/h3>\n<p>A success criterion defines the condition the project must meet; a KPI tracks performance related to that condition. For example, the criterion might be that a specified system is ready for intended use at handover. A KPI could track the share of required commissioning checks completed. The KPI provides a signal, not automatic proof that the criterion has been met. The acceptance decision still depends on the required evidence and authority.<\/p>\n<h3>Who is responsible for measuring construction project success?<\/h3>\n<p>Responsibility is shared, but it shouldn\u2019t be vague. The owner sets the outcomes and accepts evidence against them. Project leadership coordinates reporting, while people closest to the work provide source records such as inspection results, schedule updates, and cost information. Assign one accountable owner to each measure so gaps or conflicting reports have a clear resolution path. For a major decision, record who reviewed the evidence and who had authority to approve the response.<\/p>\n<h3>What should a construction project success scorecard include?<\/h3>\n<p>A scorecard should contain only measures that help assess an objective or make a decision. Alongside each result, include its definition, baseline or acceptance condition, reporting date, source, accountable owner, and current status. For example, label whether a deficiency is open, corrected, or awaiting verification, rather than showing only a total count. Include a short note on material changes so readers can interpret the result without relying on informal explanations.<\/p>\n<h3>How do you measure construction project success after handover?<\/h3>\n<p>After handover, compare the asset\u2019s observed use and performance with the outcomes established during planning. Choose measures suited to its purpose, such as whether intended functions are available, operating issues recur, or maintenance information supports routine care. Record the period covered and any factors that affect interpretation, including changes in use. This post-handover review can reveal whether construction delivery translated into practical asset value and inform decisions about future projects.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>What if a construction project meets its budget and handover date, yet still fails to deliver an asset that performs as intended? Measuring&#8230;<\/p>\n","protected":false},"author":1,"featured_media":862,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[263],"tags":[54,6,391,393,215,390,369,392],"class_list":["post-861","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-housing-missing-middle","tag-asset-management","tag-construction-management","tag-cost-and-schedule","tag-kpis","tag-project-delivery","tag-project-success-metrics","tag-quality-assurance","tag-safety-performance","autoseo"],"_links":{"self":[{"href":"https:\/\/vulpin.capital\/blog\/wp-json\/wp\/v2\/posts\/861","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vulpin.capital\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vulpin.capital\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vulpin.capital\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/vulpin.capital\/blog\/wp-json\/wp\/v2\/comments?post=861"}],"version-history":[{"count":1,"href":"https:\/\/vulpin.capital\/blog\/wp-json\/wp\/v2\/posts\/861\/revisions"}],"predecessor-version":[{"id":864,"href":"https:\/\/vulpin.capital\/blog\/wp-json\/wp\/v2\/posts\/861\/revisions\/864"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vulpin.capital\/blog\/wp-json\/wp\/v2\/media\/862"}],"wp:attachment":[{"href":"https:\/\/vulpin.capital\/blog\/wp-json\/wp\/v2\/media?parent=861"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vulpin.capital\/blog\/wp-json\/wp\/v2\/categories?post=861"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vulpin.capital\/blog\/wp-json\/wp\/v2\/tags?post=861"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}